The aftermath of a catastrophic event isn’t just about visible damage — delays or poor repair management compound the impact, driving up costs and risks.
We specialise in delivering fast, compliant, and durable recovery works for major loss events.
Works depend on the event but often include:
• Structural stabilisation
• Façade and waterproofing replacements
• Roof and balcony repairs
• Full compliance and certification
Delivered as part of integrated Defect Rectification.
Timeframes vary by severity:
• Small strata fires/floods: 2–3 months
• Medium-scale complexes: 6–12 months
• Large high-rises: 12–24 months
Scopes are confirmed through Building Investigations.
Costs depend on scale and insurance cover:
• Small projects: $100k–$500k
• Medium strata/commercial: $1m–$5m
• Large high-rise rebuilds: $10m+
Scopes align with insurer requirements and Defect Rectification standards.
Major loss projects often displace residents, but we minimise disruption with:
• Safety-first staging and containment
• Clear communication and updates
• Daily site reporting for committees and insurers
See examples in our Projects.
We provide:
• Workmanship warranties.
• Manufacturer warranties on systems
• Compliance documentation (NCC, DBP Act, insurer requirements)
Common causes include:
• Fire (combustible cladding, electrical faults)
• Floods and storms
• Structural movement or collapse
• Long-term water ingress
Many are compounded by poor maintenance or failed Waterproofing Systems.
Yes — we deliver Heritage Restoration using approved conservation methods while ensuring compliance with modern codes.
Contact Atomic Projects — Sydney’s major loss remediation specialists.
📞 0410 515 509 | ✉️ hello@atomicprojects.com.au
Or explore: Defect Rectification, Façade Remediation, Concrete Repairs.