About Us
Services
Facade Remediation
Concrete & Structural Repairs
Waterproofing Remediation
Brickwork & Render Repairs
Balcony Remediation
Cladding Replacement
Roof Repairs & Replacement
Building Investigations
Sectors
Remedial Building Services
Defect Rectification
Major Loss Insurance
Heritage Restoration
Projects
Contact Us
Our Projects
At our core, we believe buildings are more than structures - they’re homes, memories, and legacies.
Explore our recent work and see how we've brought life back to Sydney's most iconic buildings.
Facade Remediation & Cladding Replacement
Chandos St | St Leonards
Project Value: $1M+ | Client: Owners Corporation | Duration: 6 months
Structural Remediation
Pacific Hwy | Killara
Project Value: $500k | Client: Owners Corporation | Duration: 5 months
Metal Roof Replacement
Henrietta St | Chippendale
Project Value: $250k | Client: Private Owner | Duration: 2 months
Facade Upgrades
Sergeants Lane | St Leonards
Project Value: $50k | Client: Owners Corporation | Duration: 2 weeks
Office Fit Out
Herb Ave | Olympic Park
Project Value: $500k | Client: The Precinct | Duration: 2 months
Remedial Waterproofing
Shelley St | Sydney CBD
Project Value: $400k | Client: Owners Corporation | Duration: 4 months
Heritage Facade Restoration
Maddox St | Alexandria
Project Value: $250k | Client: Owners Corporation | Duration: 2 months
Concrete Spalling Repair
Coolong Rd | Vaucluse
Project Value: $50k | Client: Owners Corporation | Duration: 2 weeks
Facade Remediation & Cladding Replacement
Chandos Street | St Leonards
Project Value: $1M+ | Client: Owners Corporation | Duration: 6 months
ACP cladding was replaced under council order, along with rooftop re-waterproofing and new window and door systems. The works ensured compliance, improved building safety, and delivered a watertight envelope for the long term.
Structural Remediation
Pacific Hwy | Killara
Project Value: $500k | Client: Owners Corporation | Duration: 5 months
A ground-level slab supporting three levels above required staged remediation. The project was carefully executed with A-B staging and underpinning of perimeter walls to maintain structural integrity throughout construction.
Metal Roof Replacement
Henrietta St | Chippendale
Project Value: $250k | Client: Private Owner | Duration: 2 months
The existing roof was severely rusted, causing persistent leaks and overflowing gutters. We replaced all roof sheets, upsized the box gutters, and installed new flashings and cappings to restore weatherproofing.
Facade Upgrades
Sergeants Lane | St Leonards
Project Value: $50k | Client: Owners Corporation | Duration: 2 weeks
Concrete spalling presented a high risk of falling debris onto the city footpath below. Using rope access and catch nets, we carried out safe, targeted concrete repairs to protect both the structure and the public.
Office Fit Out
Precinct Co-Working | Olympic Park
Project Value: $500k | Client: The Precinct | Duration: 2 months
We delivered a full office fit-out across an entire tenancy level. The works were completed to spec for the incoming tenant, balancing quality finishes with efficiency to meet tight move-in deadlines.
Remedial Waterproofing
Shelley St | Sydney CBD
Project Value: $400k | Client: Owners Corporation | Duration: 4 months
The apartment pool had widespread leaks caused by failed waterproofing. We rebuilt the pool system from the ground up — removing defective layers, reinstating the waterproofing, and delivering a long-term watertight solution that preserved both safety and amenity for residents.
Heritage Facade Restoration
Maddox St | Alexandria
Project Value: $250k | Client: Owners Corporation | Duration: 2 months
The dilapidated brick façade posed safety risks from loose and unstable masonry. We repointed the façade, replaced damaged bricks, rebuilt brick corbels, carried out crack stitching, and resealed the envelope to preserve its heritage character.
Concrete Spalling Repair
Coolong Rd | Vaucluse
Project Value: $50k | Client: Owners Corporation | Duration: 2 weeks
The concrete pool had severe honeycombing and spalling that threatened structural performance. Repairs reinstated the concrete’s durability, ensuring the pool was safe, watertight, and ready for long-term use.