For Engineers & Consultants · Sydney

A builder that builds to your specification.

Remedial works delivered exactly as specified — hold points called and verified, deviations flagged not improvised, and an auditable QA trail that stands behind your report. So recommending us reflects well on you.

Structural, façade & building consultants · Projects from $100K

No obligation. We respond within 24 hours.

100 +
Buildings
$20M +
Delivered
15 +
Years experience
4.7
Google rating
Discuss a project with us.
Tell us about your building. We respond within 24 hours.
We respond within 24 hours. No spam, ever.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
How we work to a spec

We build what you specified — and prove it.

The remedial jobs that expose an engineer are the ones where the builder substitutes a system, skips a hold point, or can't produce the documentation the report relies on. The deviation lands on your design, and the gap lands on your certification.

We work the opposite way: we build to the spec, call hold points and wait for verification, and hand over an auditable QA trail. Recommending us reflects well on you because the work was delivered exactly as you specified it — and evidenced.

Discuss a project
1

We build to the specified system

The membrane, the repair method, the detail you nominated — built as drawn. No substitutions without your written sign-off.

2

We call hold points and wait

Every inspection booked ahead, and work doesn't proceed past a hold point until you've verified it — so nothing critical gets covered up before you've seen it.

3

We document to audit standard

ITPs, test results, dated photos and third-party verification — assembled as an auditable trail, not reconstructed after the fact.

4

We work to the standards you cite

AS 3600, AS 4654.2 and the NCC as specified, and under the DBP Act where the work is regulated — built to the code, not “near enough”.

The delivery map

Where a build exposes the engineer — and where we de-risk it.

A remedial build puts the engineer's design liability and PI on the line at four points — specification, hold points, documentation and close-out. Here's the trap at each stage, and how we're set up so it doesn't become your exposure.

1Specification

Building to spec.

⚠ The trap

A builder substitutes a cheaper system or detail, and the deviation lands on your design liability — not theirs.

✓ How we set it up

We build the specified system — deviations flagged for your sign-off, never assumed.

2Hold points

Verifying the work.

⚠ The trap

Work proceeds past a hold point before you've inspected — and you can't verify what's now covered up.

✓ How we set it up

We book hold points ahead and wait for your verification.

3Documentation

Evidence for your report.

⚠ The trap

Thin or missing QA records leave your certification unsupported if it's ever questioned.

✓ How we set it up

ITPs, test results and photos assembled as an auditable trail.

4Close-out

Standing behind it.

⚠ The trap

A build that can't be evidenced exposes your PI if it's ever questioned down the track.

✓ How we set it up

A complete, auditable record at handover.

⚡ Need a builder who'll actually build to your spec? Let's talk.
Why the builder reflects on you

Recommend the wrong builder and the liability lands on your PI.

On a remedial job the contractor's habits become the engineer's exposure. The wrong pick doesn't just risk the build — it risks your design liability, your certification and your professional indemnity.

01

Deviations become your design risk

A builder who substitutes systems or improvises details puts the consequences back on your specification and your indemnity — even though the deviation was theirs, not yours.

02

Covered-up work you didn't verify

Once a hold point is passed without inspection, you're certifying something you couldn't see. A builder who waits for your verification protects your sign-off.

03

Thin documentation undermines your report

Your certification is only as strong as the QA trail behind it. Without the evidence, your report is exposed the moment it's ever challenged.

⚡ Need a builder who'll actually build to your spec? Let's talk.
How we work to a spec

Built to your specification — verified, not improvised.

For an engineer, the question isn't what a builder costs — it's whether they'll deliver exactly what you specified and prove it. Here's how we work so the answer is yes, every time.

01

We build the specified system

The membrane, the repair method, the detail you nominated — built as drawn. No substitutions, no “equivalent” products and no on-site reinterpretation without your written sign-off.

02

We call hold points and wait

Every inspection is booked ahead, and work does not proceed past a hold point until you've verified it — so nothing critical is covered up before you've seen it.

03

We document to audit standard

ITPs, test results, dated photos and third-party verification — assembled as an auditable trail that stands behind your report, not reconstructed after the fact.

04

We work to the standards

AS 3600, AS 4654.2 and the NCC as specified, and under the DBP Act where the work is regulated — built to the code you've cited, not “near enough”.

Our work

Built to spec. Hold points verified. Documented.

Three occupied projects chosen for what matters to an engineer: works built to the specified system, every hold point verified before the next opened, and a complete, auditable record at handover.

Manly low-rise strata balcony waterproofing project — Atomic ProjectsROOFTOP PVC Waterproofing

Mid-Rise Strata — Warwick Farm

One residential tower with active roof leaks. Rooftop waterproofing had failed and water was getting into the units below every time it rained. We stripped the roof back to substrate, found the root-cause of failure at service penetrations and installed a new sheet membrane system with proper falls and drainage.

"They set up their team and completed the works all at once, not a single day of lost time was caused."

— STRATA MANAGER, WARWICK FARM

500m²Rooftop Area
5Months
$650kProject Value
Manly low-rise strata balcony waterproofing project — Atomic ProjectsCONCRETE CANCER · MAGNESITE

Mid-rise strata — Killara

A root-cause investigation traced concrete cancer and cracking through the internal slabs to magnesite topping — so a full slab remediation was needed to restore the structure. We removed the drummy concrete, treated and replaced corroded steel, and reinstated with Sika repair mortar under the direction of a Class 2 Design Practitioner. Residents stayed in place the whole time.

"Residents stayed in place the entire time — the staged works kept the building safe and the disruption minimal."

— COMMITTEE MEMBER, KILLARA

8Weeks
0Complaints
$100KProject Value
Darling Point rooftop waterproofing project — Atomic ProjectsCLASS 2 · BRICKWORK REMEDIATION

Low-rise strata — Alexandria

Bricks detaching from a heritage facade directly above the footpath — a falling-debris risk to pedestrians. Run under a Class 2 registered practitioner: a full restoration program of repointing, brick replacement, crack stitching with stainless steel helicals and corbel rebuilds, with the compliance trail documented throughout. Facade stabilised in two months with zero compromise to the building's original character.

"Bricks were literally falling onto the footpath. They made it safe within days and then restored the whole facade."

— STRATA MANAGER, ALEXANDRIA

Class 2Registered
2 MonthsDuration
$250KProject Value
Why engineers specify us

Atomic vs a builder who improvises on site.

Two builders can hold the same licence and treat your specification completely differently once they're on site. Here's the gap that actually decides whether your report holds up — and whether your PI is protected.

On your specification
A builder who improvises
Atomic Projects
The system
Substituted to save cost
Built as specified
Hold points
Passed before inspection
Called & verified
Deviations
Decided on site
Flagged for sign-off
Documentation
Thin or missing
Auditable QA trail
Standards
“Near enough”
AS 3600 / 4654.2 / NCC as cited& confirmed first
Evidence for your report

The verification pack that stands behind your certification — and what to send us.

Your report is only as strong as the evidence behind it. We assemble that evidence as we build, so the verification trail is complete when you need to certify. Here's what's in the pack, and what we need from you to build to.

What's in the verification pack

Assembled as the work proceeds — not reconstructed afterwards — so the trail behind your certification is auditable and complete.

ITPs — with hold and witness points signed off as the work passes each stage.

Test results — e.g. flood tests and moisture readings, recorded against the criteria.

Dated photos — at each stage, by area and work type, before anything is covered up.

Third-party verification — engaged where the spec or standard requires it.

Compliance certificates — for the systems and materials installed.

As-built / close-out record — a complete, auditable handover at practical completion.

What to send us

The more of this you have, the more precisely we can build to your design. Don't have it all? The defect and the building are enough to start.

Your specification / scope of works — the systems and methods you've nominated.

The drawings & details — so we build to the detail, not an interpretation of it.

Nominated hold / witness points — where you want to inspect and verify.

The standards & compliance requirements — the codes the work must meet.

The project programme — any fixed dates, access windows or inspection lead times.

⬇ Download the engineer & consultant remedial readiness checklist (PDF)A sample verification / QA pack for the engineer to preview.
Straight answers on price

What remedial works cost — so you can advise your client.

Costs depend on severity, access and the systems specified. These are realistic ranges to help you advise your client on likely order of cost — the fixed price is confirmed after we assess the work against the design, before anything starts.

Localised works
$100k–$250k

A single specified scope — membrane, concrete repair, balustrade or drainage detail.

Multi-scope programme
$250k–$1m

Several specified scopes delivered under one contract across the building.

Whole-building remediation
$1m–$5m+

Full façade, cladding, structural and waterproofing systems to specification.

Every scope is priced against the specification and the confirmed conditions — no mystery line items, no “we'll see when we open it up” that becomes a deviation from your design.

Risk reversal

The work is warrantied in writing. Verify everything.

Most balcony repairs fail because the last contractor patched instead of fixed — and walked away with no warranty. We don't.

Written 10-year warrantyA defined term, in writing — not the vague "warranty provided" everyone else offers.
Class 2 DBP — Licence 360636CVerify us on the NSW Fair Trading register before you call. We'd rather you check.
Engineer-directed & documentedA QA paper trail your committee and engineer can audit at any stage.
Leak investigation includedWe confirm the actual source before we pull anything apart. Not charged as an extra.

We'd rather you check than take our word for it.

What happens after you get in touch

From spec to verified delivery — no mystery.

1
You get in touchSend the spec, the drawings, or the scope of works — and any nominated hold points.Within 24 hrs
2
Site assessmentWe visit and confirm site conditions against the design — flagging anything that needs your input.Days, not weeks
3
Methodology & programmeA method built to your spec, with hold points scheduled and verification lead times built in.Built to the detail
4
Delivery & verificationWork to spec, hold points verified before the next opens, and a QA pack on completion.Documented
Is this you?

We're a fit for some projects, not all.

This is for you if…

  • You're an engineer or consultant specifying remedial works and need a builder who builds to spec.
  • You need hold points called and verified — not passed before you've inspected.
  • You need an auditable QA trail for your report and certification.
  • The building is occupied and works need staging around tenants, residents or trading hours.
  • The project is from around $100K and up.

Probably not us if…

  • It's a single-dwelling house, not a strata or commercial building.
  • You want a builder shopping for the cheapest interpretation of the spec — that's not how we build.
  • It's a sub-$100K cosmetic one-off — a local trade is a better fit than a remedial builder.
  • You need it this week with no methodology — we build to a method and schedule hold points first.
They built exactly what I specified, called every hold point, and the documentation backed my report without me chasing it.
SE
Remedial Engineer
Sydney
Atomic Projects founder on a Sydney remedial building site
Who you're dealing with

You'll deal with the builder, not a call centre.

I started Atomic Projects because too many remedial builders treat an engineer's specification as a starting suggestion — and the engineer carries the liability when it's not followed. Every project we take, I'm accountable for, and we build what's specified. Send me the spec and I'll tell you straight how we'll deliver and verify it.

— The Atomic Projects founderClass 2 DBP registered builder · Licence 360636C
Common questions

What an engineer will want to know.

Will you build exactly to my specification?+
Yes — that's the point of how we work. The systems, materials and details you've nominated are built as drawn. We don't substitute “equivalent” products or reinterpret a detail on site without bringing it back to you for written sign-off first.
How do you handle hold points and verification?+
We book every nominated hold point ahead so you have lead time to attend, and work does not proceed past it until you've verified. That means nothing critical — a waterproofing cavity, a repair before cover — gets closed up before you've inspected it.
What documentation do I get to support my report?+
An auditable verification pack: ITPs with hold and witness points signed off, test results such as flood tests and moisture readings, dated photos at each stage, third-party verifications, compliance certificates and an as-built close-out record — assembled as we build, not reconstructed afterwards.
What if site conditions differ from the design?+
We flag it to you — we don't improvise. If we open up the work and find conditions that don't match the design, that's a deviation for you to decide on, not us. You get the information and the options; the design call stays with you.
Do you work to AS 3600 / AS 4654.2 / NCC?+
Yes — concrete and structural repair to AS 3600, waterproofing of wet areas and external above-ground membranes to AS 4654.2, and the NCC as it applies, all as cited in your specification. We build to the code you've referenced, not “near enough”.
Are you registered for regulated work?+
Yes — Class 2 DBP registered, Licence 360636C, verifiable on the NSW Fair Trading register. On Class 2 buildings, structural, waterproofing and fire-safety work is regulated under the DBP Act, and we lodge the required documentation.
How do you price against an engineer's specification?+
Like for like: the tender is priced against your specification and schedule of rates without substitutions, exclusions buried in the fine print, or scope reinterpretation. If we believe a detail will not build well, we raise it as a documented query rather than pricing around it. That keeps your client's tender comparison clean and your design intent intact.
Can a remedial contractor review buildability before tender?+
Yes, and it is worth doing on staged or access-constrained buildings. A pre-tender buildability review flags access and staging constraints, sequencing risks and details that are difficult to execute on an occupied building, while the design can still absorb changes. It tends to reduce tender qualifications and mid-works variations, which is where consultant-client relationships get strained.
How quickly can works mobilise once the specification is issued?+
Allow two to four weeks of pre-construction after contract execution: regulatory lodgements under the DBP Act, safety and quality management plans, the construction program, access coordination and the notice of works to residents, which goes out at least 14 days before site start. Compressed timelines are possible where the documentation is ready, but those steps are not skipped.
Do you work on occupied buildings?+
Almost exclusively. Sydney strata and commercial remediation means residents in place and businesses trading, so staging by zone, exclusion zones, resident notices and a named site contact are standard operating procedure rather than special measures. For consultants, that means methodology responses address occupancy directly instead of assuming vacant possession that never exists.
What happens during the defects liability period?+
The contractor remains responsible for rectifying defects that emerge after practical completion, typically for 12 months. Items are reported, attended and closed out with records, and the practical completion certificate defines the period and any exclusions. For consultants, the hold-point and inspection records from delivery make DLP assessments straightforward because the covered-up work is already evidenced.
Specify a builder who builds to spec

Specify a builder who builds to spec.

Send the spec, the drawings, or the scope of works. A registered builder calls back within 5 minutes, 7am–5pm weekdays.

Discuss a project with us.
Tell us about your building. We respond within 24 hours.
We respond within 24 hours. No spam, ever.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
CallDiscuss a project →