Remedial works delivered exactly as specified — hold points called and verified, deviations flagged not improvised, and an auditable QA trail that stands behind your report. So recommending us reflects well on you.
No obligation. We respond within 24 hours.





The remedial jobs that expose an engineer are the ones where the builder substitutes a system, skips a hold point, or can't produce the documentation the report relies on. The deviation lands on your design, and the gap lands on your certification.
We work the opposite way: we build to the spec, call hold points and wait for verification, and hand over an auditable QA trail. Recommending us reflects well on you because the work was delivered exactly as you specified it — and evidenced.
Discuss a project →The membrane, the repair method, the detail you nominated — built as drawn. No substitutions without your written sign-off.
Every inspection booked ahead, and work doesn't proceed past a hold point until you've verified it — so nothing critical gets covered up before you've seen it.
ITPs, test results, dated photos and third-party verification — assembled as an auditable trail, not reconstructed after the fact.
AS 3600, AS 4654.2 and the NCC as specified, and under the DBP Act where the work is regulated — built to the code, not “near enough”.
A remedial build puts the engineer's design liability and PI on the line at four points — specification, hold points, documentation and close-out. Here's the trap at each stage, and how we're set up so it doesn't become your exposure.
A builder substitutes a cheaper system or detail, and the deviation lands on your design liability — not theirs.
We build the specified system — deviations flagged for your sign-off, never assumed.
Work proceeds past a hold point before you've inspected — and you can't verify what's now covered up.
We book hold points ahead and wait for your verification.
Thin or missing QA records leave your certification unsupported if it's ever questioned.
ITPs, test results and photos assembled as an auditable trail.
A build that can't be evidenced exposes your PI if it's ever questioned down the track.
A complete, auditable record at handover.
On a remedial job the contractor's habits become the engineer's exposure. The wrong pick doesn't just risk the build — it risks your design liability, your certification and your professional indemnity.
A builder who substitutes systems or improvises details puts the consequences back on your specification and your indemnity — even though the deviation was theirs, not yours.
Once a hold point is passed without inspection, you're certifying something you couldn't see. A builder who waits for your verification protects your sign-off.
Your certification is only as strong as the QA trail behind it. Without the evidence, your report is exposed the moment it's ever challenged.
For an engineer, the question isn't what a builder costs — it's whether they'll deliver exactly what you specified and prove it. Here's how we work so the answer is yes, every time.
The membrane, the repair method, the detail you nominated — built as drawn. No substitutions, no “equivalent” products and no on-site reinterpretation without your written sign-off.
Every inspection is booked ahead, and work does not proceed past a hold point until you've verified it — so nothing critical is covered up before you've seen it.
ITPs, test results, dated photos and third-party verification — assembled as an auditable trail that stands behind your report, not reconstructed after the fact.
AS 3600, AS 4654.2 and the NCC as specified, and under the DBP Act where the work is regulated — built to the code you've cited, not “near enough”.
Three occupied projects chosen for what matters to an engineer: works built to the specified system, every hold point verified before the next opened, and a complete, auditable record at handover.

One residential tower with active roof leaks. Rooftop waterproofing had failed and water was getting into the units below every time it rained. We stripped the roof back to substrate, found the root-cause of failure at service penetrations and installed a new sheet membrane system with proper falls and drainage.
"They set up their team and completed the works all at once, not a single day of lost time was caused."
— STRATA MANAGER, WARWICK FARM

A root-cause investigation traced concrete cancer and cracking through the internal slabs to magnesite topping — so a full slab remediation was needed to restore the structure. We removed the drummy concrete, treated and replaced corroded steel, and reinstated with Sika repair mortar under the direction of a Class 2 Design Practitioner. Residents stayed in place the whole time.
"Residents stayed in place the entire time — the staged works kept the building safe and the disruption minimal."
— COMMITTEE MEMBER, KILLARA

Bricks detaching from a heritage facade directly above the footpath — a falling-debris risk to pedestrians. Run under a Class 2 registered practitioner: a full restoration program of repointing, brick replacement, crack stitching with stainless steel helicals and corbel rebuilds, with the compliance trail documented throughout. Facade stabilised in two months with zero compromise to the building's original character.
"Bricks were literally falling onto the footpath. They made it safe within days and then restored the whole facade."
— STRATA MANAGER, ALEXANDRIA
Two builders can hold the same licence and treat your specification completely differently once they're on site. Here's the gap that actually decides whether your report holds up — and whether your PI is protected.
Your report is only as strong as the evidence behind it. We assemble that evidence as we build, so the verification trail is complete when you need to certify. Here's what's in the pack, and what we need from you to build to.
Assembled as the work proceeds — not reconstructed afterwards — so the trail behind your certification is auditable and complete.
ITPs — with hold and witness points signed off as the work passes each stage.
Test results — e.g. flood tests and moisture readings, recorded against the criteria.
Dated photos — at each stage, by area and work type, before anything is covered up.
Third-party verification — engaged where the spec or standard requires it.
Compliance certificates — for the systems and materials installed.
As-built / close-out record — a complete, auditable handover at practical completion.
The more of this you have, the more precisely we can build to your design. Don't have it all? The defect and the building are enough to start.
Your specification / scope of works — the systems and methods you've nominated.
The drawings & details — so we build to the detail, not an interpretation of it.
Nominated hold / witness points — where you want to inspect and verify.
The standards & compliance requirements — the codes the work must meet.
The project programme — any fixed dates, access windows or inspection lead times.
Costs depend on severity, access and the systems specified. These are realistic ranges to help you advise your client on likely order of cost — the fixed price is confirmed after we assess the work against the design, before anything starts.
A single specified scope — membrane, concrete repair, balustrade or drainage detail.
Several specified scopes delivered under one contract across the building.
Full façade, cladding, structural and waterproofing systems to specification.
Every scope is priced against the specification and the confirmed conditions — no mystery line items, no “we'll see when we open it up” that becomes a deviation from your design.
Most balcony repairs fail because the last contractor patched instead of fixed — and walked away with no warranty. We don't.
We'd rather you check than take our word for it.

I started Atomic Projects because too many remedial builders treat an engineer's specification as a starting suggestion — and the engineer carries the liability when it's not followed. Every project we take, I'm accountable for, and we build what's specified. Send me the spec and I'll tell you straight how we'll deliver and verify it.
Send the spec, the drawings, or the scope of works. A registered builder calls back within 5 minutes, 7am–5pm weekdays.