Combustible cladding removed and replaced with certified non-combustible systems for Sydney strata and commercial buildings — fire-order response, facade certification, and a full audit trail.





Cladding replacement is removing non-compliant combustible cladding — usually aluminium composite panel (ACP) or combustible render systems — and replacing it with a certified non-combustible system. It's driven by safety and compliance: a fire order, a building audit, or an insurer or buyer flagging the panels.
The job is more than swapping panels. The framing and substrate behind the cladding often need work, the new system has to integrate with the building's waterproofing and windows, and the whole thing has to be documented and certified — because the point of the project is to close out the order, not just change the look.
Combustible cladding isn't always obvious from the ground. These are the triggers that mean it needs to be assessed and acted on.
Combustible cladding is a safety and legal issue with a clock on it. Left unactioned, the exposure compounds — financially and legally.
Combustible cladding is a fire-spread risk to everyone in the building. That's why orders exist — and why they carry deadlines.
An open fire order is a legal obligation. Unactioned, it brings insurance loadings or refusal, stalled sales, and personal exposure for the owners corporation.
Costs and program pressure rise the longer an order sits. Acting early gives you a controlled, documented path instead of a rushed one.
We treat cladding as a compliance project, not just a re-clad — scoped, certified and documented to close the order out.
A facade and cladding assessment confirms what has to come off and what compliant system replaces it — scoped to satisfy the specific order or audit, alongside any investigation needed.
Non-compliant ACP and combustible systems are removed under a controlled, documented process — with the building kept safe and occupied throughout.
While the wall is open we upgrade the framing and substrate and integrate the new system with the building's waterproofing and windows — often part of broader facade remediation.
An A1/A2-rated system installed to manufacturer specification, then the facade certification and audit trail that proves compliance — the part that actually closes the order.
Removal through to certified replacement — each scoped on its own or as a single compliance program over an occupied building.
The cheap quote hangs new panels and leaves the paperwork to you. Here's what closing an order properly takes.

Non-compliant ACP cladding identified and removed under a council fire safety order. Full facade re-clad with a certified non-combustible system, including framing upgrades and weatherproofing integration. Three scopes — cladding, waterproofing and glazing — delivered as a single program to simplify compliance and reduce disruption.
They combined three major scopes into one program and dealt with council directly. We expected 12 months of chaos — it was done in eight.
— STRATA MANAGER, ST LEONARDS

Non-compliant aluminium composite panels removed and replaced with a certified cladding system across the full building envelope. All existing framing upgraded to support the new system. Works delivered using drop-down scaffold and swing stages to maintain building access and minimise disruption to tenants.
"Clean removal, new system installed, and the building looks better than it ever did. No disruption to our tenants."
— BUILDING MANAGER, MACQUARIE PARK

Non-compliant ACP panels identified on a commercial building in North Ryde. Full removal and replacement delivered using scaffold. New framing and a compliant cladding system installed with facade and C10 fire engineering certification submitted to council upon completion.
"They used full scaffold — Did the project faster, less disruptive, and the compliance paperwork was spotless."
— FACILITIES MANAGER, NORTH RYDE
A cladding project that doesn't close the order is money wasted. Ours delivers the certification and the proof.
Send the fire order or audit, or describe the cladding flagged on your building.
Within 24 hrsWe confirm what's non-compliant and the compliant system that replaces it.
Days, not weeksA documented scope built to satisfy your specific order, ready for the committee.
Ready for AGMRemoved, re-clad and certified — residents in place, order closed out.
On your scheduleWe'd rather tell you upfront than waste your committee's time.

A cladding project only succeeds if it closes the order — and that comes down to the system you install and the documentation you hand over. We use certified non-combustible systems, deal with the authorities directly, and prove compliance on paper. Send me the order and I'll tell you straight what a compliant path looks like.
These are realistic ranges — your fixed price is confirmed after a building investigation, before any work starts.
Targeted removal and certified replacement on lower-rise buildings.
Full cladding replacement across a mid-rise residential or commercial building.
Building-wide combustible-cladding replacement and certification programmes.
Cost depends on the cladding area, access and the system specified — confirmed by assessment before any work starts, and scoped to close your order.
We'll visit your building, confirm the source of the leak, and give you a clear, fixed-price path forward — free, no obligation. We respond within 24 hours.
Combustible cladding removed, replaced with a certified system, integrated with the facade and documented to close the order. Book a free assessment or a 15-min call.