Balcony Waterproofing and AS 4654: What the Standard Actually Requires

What AS 4654.2 requires for balcony waterproofing — falls, upturns, thresholds and drainage — and what it means when an existing NSW strata balcony doesn't comply.

Completed strata balcony after waterproofing remediation in Sydney, with new tiled surface laid to fall and glass balustrade reinstated.

Every balcony defect report in NSW eventually names the same document: AS 4654.2. It gets quoted at owners corporations as if it settles the argument — the balcony doesn’t comply, so it has to be rebuilt.

Sometimes that’s right. Often it’s more complicated, because AS 4654.2 is a design and installation standard written for new work. Your building is not new work. Understanding the difference is what separates a $40k balcony program from a $400k one.

This guide sets out what the standard actually requires, what it means when an existing balcony doesn’t meet it, and the decisions a strata committee has to make in between. It covers the same ground we walk through on balcony repairs and remediation projects across Sydney.

What is AS 4654.2 and does it apply to my building?

AS 4654.2-2012 is the Australian Standard for waterproofing membranes used externally above ground — roofs, decks, balconies and planter boxes. It is referenced in the National Construction Code as a Deemed-to-Satisfy pathway (F1D4 and F1D5 in Volume One, H2D8 in Volume Two). If a balcony was built to the Code, it was meant to be built to this standard.

It applies to your building in two ways. For original construction, it sets the benchmark an engineer will measure the existing balcony against. For remedial work, it sets what the new system has to achieve once you open the balcony up — and that is where the cost sits.

What falls does AS 4654.2 require on a balcony?

A trafficable balcony needs a minimum fall of 1:100 to the drainage outlet — 10mm of drop over a metre. Newer Code provisions push the substrate fall to 1:80 to allow for build-up tolerance, so confirm the current requirement with your certifier before design. Ponding water on a finished balcony is the clearest sign fall was never achieved.

This single number causes more remedial cost than any other clause. A balcony built flat cannot be brought to 1:100 by recoating it. You either lift the tiles and lay a new screed to fall, or you lift the tiles, grind the slab and lay a new screed to fall — and if the slab has already lost cover, you’re into rebuilding a failed waterproofing system over repaired concrete rather than a tidy re-tile.

How high does the membrane have to go up the wall?

The membrane must turn up vertically against adjoining walls and terminate above the finished surface — commonly 100mm to 150mm, though required termination heights range from roughly 40mm to 180mm depending on the building’s wind classification and how the door threshold is detailed.

This is the detail most often missed on older balconies, because the upturn is hidden behind render or cladding. It is also the reason a leaking balcony is rarely just the balcony — water that gets behind a short upturn tracks into the wall cavity and shows up in the apartment below, two rooms away from the actual failure.

What does the standard say about door thresholds?

The balcony surface must be set down below the internal floor so water cannot run inside — commonly at least 50mm, with the membrane dressed into and under the door frame. Where a level threshold is required for accessibility, the standard expects a compensating drainage design, such as a grate directly at the door.

Thresholds are the hardest thing to fix retrospectively. You cannot lower a balcony slab, so achieving set-down on an existing building usually means removing the tile and screed build-up entirely, or accepting a designed drainage solution at the door instead. Expect this to be the item your engineer and your builder argue about.

What about drainage and overflows?

The standard requires outlets sized and located so the balcony drains completely, plus overflow provision so a blocked outlet cannot pond water above the membrane upturn. One outlet in one corner, with no overflow, is a design failure regardless of how good the membrane is.

On strata buildings we routinely find outlets set above the finished screed level — the drain is physically higher than the water it is meant to collect. No membrane fixes that.

Does an old balcony have to comply with AS 4654.2 today?

Not retrospectively, as a general rule — a balcony built to the code of its day is not automatically unlawful now. But once you carry out remedial work, the new work is expected to meet the current standard, and your certifier, engineer and insurer will all assess it on that basis.

This is the point most committees miss. The question is not “does our balcony comply?” It is “what will we be required to build when we touch it?” That answer drives the budget, and it is why partial patch repairs so often turn into full replacement scopes mid-project.

What does non-compliance actually cost to fix?

What the balcony fails onTypical remedial responseCost driver
Membrane worn or punctured, falls OKStrip tiles, new membrane, re-tileLowest — finishes only
Insufficient fall / pondingStrip to slab, new screed to fall, new membraneScreed volume + build-up height
Short or missing wall upturnOpen adjoining wall finish, dress upturn, reinstate render or claddingFacade make-good, access
Threshold set-down not achievedRemove build-up or design drainage at doorOften needs engineer sign-off
Concrete spalling under the membraneConcrete repair first, then full systemStructural repair + extended program

We deliberately avoid a per-square-metre figure here, because the range is set by which of these five you’re actually dealing with, not by membrane price. For indicative bands, see what balcony waterproofing costs in Sydney.

Who is responsible for getting this right?

On a Class 2 building, responsibility sits with the owners corporation for common property, discharged through a designer or engineer who specifies the system and a registered practitioner who builds it. Under the Design and Building Practitioners Act, waterproofing is a regulated design — the design must be declared, and the builder must build to it.

That has a practical consequence: your contractor cannot lawfully “work it out on site”. If the scope you’ve been given doesn’t resolve fall, upturn and threshold before work starts, you don’t have a scope — you have a variation waiting to happen. The Atomic Projects remedial building team treats those three items as the first conversation on every balcony job, not the last.

How we approach it

On a recent Class 2 program in St Leonards, the engineer’s report called for membrane replacement on 40 balconies. Invasive investigation on the first four found the screed had been laid dead flat and the outlets sat proud of the finished level. Re-membraning would have produced 40 compliant membranes over 40 non-compliant balconies, and the same leaks two years later.

The scope changed to full strip-out and re-screed on the affected stacks. More expensive on day one, and the only version that would have survived a defects claim. That sequencing logic is the same one we apply to re-waterproofing a balcony in a Class 2 apartment block generally: diagnose the substrate before pricing the membrane.

Atomic Projects is a Class 2 DBP Registered Building Practitioner and has delivered $20M+ of remedial work across 100+ Sydney strata buildings, from $50k balcony repairs to $5M+ facade programs.

If you’ve been handed a balcony report and can’t tell whether you’re looking at a membrane job or a rebuild, we’ll assess it and tell you which — get a free assessment.

Ben Tran
General Manager, Atomic Projects
Class 2 DBP registered · Licence 360636C · 0410 515 509
Talk to Ben →or ben@atomicprojects.com.au
TAKE THE NEXT STEP

Book a free building assessment.

Send photos, the engineer's report, or just the symptoms — whatever you've got. A registered builder reads it and calls you back. No call centre, no obligation.

✓5-minute callback in business hours — within 24 hours otherwise.
✓You deal with the builder, not a salesperson.
✓Fixed-price scope, documented and engineer-checkable.
★Class 2 DBP registered · Licence 360636C
Get a quote
Tell us about your building. We respond within 24 hours.
We respond within 24 hours. No spam, ever.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
📞Get a concrete assessment →